About the sector
Data centre programmes are judged on one date: energisation. Hivenox keeps the critical path, the long-lead equipment and the commercial position visible together, so a slip in one shows up against the other before it costs you a quarter of capacity.
Every week of schedule is a week of revenue. Hold the programme and hold the margin.
What the programme is up against
Time-to-capacity
Every week between practical completion and energisation is a week the asset earns nothing.
Long-lead equipment
Switchgear, chillers and generators drive the programme long before they reach site.
Repeatable halls
The same hall built many times over — a defect learned once should never be paid for twice.
Margin under escalation
Fixed-price commitments against moving material and subcontract costs.
The challenge
Hall-by-hall handover means six overlapping critical paths against one shared electrical infrastructure. Switchgear and chiller deliveries sit on the longest lead times on the job, and every delivery date that moves quietly moves an energisation date with it.
The approach
How Hivenox and its AI Workers are designed to run a programme like this, on one record. A person approves, rejects or queries every decision.
- 01
One programme, six paths
Delivery Assurance is designed to track each hall against the shared infrastructure, so a slip is attributed to the hall it actually threatens.
- 02
Long-lead watch
Procurement & Supply is designed to read supplier confirmations and flag the drift between the promised date and the date the programme assumes.
- 03
Commercial exposure, hall by hall
Commercial Intelligence is designed to hold variations, escalation claims and the cost-to-complete against each hall rather than the job as a whole.
- 04
One executive view
Executive & Portfolio is designed to report by exception — the halls that are fine stay quiet.
An AI Worker in action
A worked example of the check the Delivery Assurance AI Worker is designed to run: connected sources, a comparison, a flagged risk and a decision sent to a person.
- Primavera P6
- Microsoft Project
- Site diaries
- Look-ahead plans
Milestone ‘Level 12 slab pour’ is slipping 6 days
Likely impact: HighResequence the formwork crew
What changes
What the approach is designed to change. Illustrative, not a measured result.